Project Gallery

PV Installation Projects Solar Cleaning Projects

Alxa Wusitai PV Installation Project

Installed capacity: 200 MW

Operation Time: 2025-07

Project environment: Arid conditions, large day-night temperature fluctuations, and windblown sand.

Inner Mongolia Xilingol Zhenxiangbai Banner PV Project

Installed capacity: 200 MW

Operation Time: June 2025

Project environment: Arid, with strong winds and sandstorms

Ningxia Zhongwei PV Installation Project

Installed capacity: 200 MW

Operation Time: June 2025

Project environment: Arid, with strong winds and sandstorms

Inner Mongolia Ulanqab PV Installation Project

Installed capacity: 200 MW
Operation Time: December 2024

Project environment: High altitude, cold temperatures, strong winds, and heavy snowfall

Inner Mongolia Mandula PV Installation Project

Installed capacity: 250 MW
Operation Time: December 2024

Project environment: High altitude, cold temperatures, strong winds, and heavy snowfall

Inner Mongolia Ordos Dalat Banner PV Installation Project

Installed capacity: 700 MW
Operation Time: 2024-10

Project environment: Arid, with intense sunlight and frequent windblown sand.

Sichuan Aba Prefecture PV Installation Project

Installed capacity: 250 MW
Operation Time: December 2023

Project environment: High altitude, cold climate, strong winds

Qinghai Gonghe County PV Installation Project

Installed capacity: 700 MW
Operation Time: 2023-12

Project environment: Arid and high-temperature conditions, intense sunlight, and windblown sand.

< 1 >

Xinjiang Tarim Oilfield Photovoltaic Power Station Operations and Maintenance Projects

Installed capacity: 100 MW

Operation Time: 2024-11

Project environment: Arid, high temperatures, and strong winds with sand and dust.

Gansu Jinchang Photovoltaic Power Station Operations and Maintenance Projects

Installed capacity: 200 MW

Operation Time: 2024-11

Project environment: Arid, with strong winds and sandstorms

Inner Mongolia Baiyun Ebo Power Station Operations and Maintenance Projects

Installed capacity: 60 MW

Operation Time: 2024-10

Project environment: Strong winds, wet and soft terrain, significant temperature fluctuations

< 1 >